In the Royal Opera 2015 premiere of Morgen und Abend, an 18kW HMI fixture was a key piece of the design. This unit had to fly in an arc representing the passage of the sun 24m across the stage and 9m vertically.
Triple E provided the mechanical systems and Lamp & Pencil provided the cabling and cable management to get AC, DC and control data to the lamp.